CONSTRUCTION AND COMMISSIONING OF CSP PLANTS

RENOVETEC has published the book construction and commissioning of CSP plants. The book, with almost 500 pages in colour, distributed in two volumes, is facing the process of construction of a solar thermal power plant of CSP technology, analyzing the three basic factors of any construction: all technical aspects, with the level of detail appropriate to each one of the systems, the term, with an indication of the planning of construction and the costs, with detail of the guidelines of each of the involved systems costs.


ISBN: 978-84-606-7613-3

Price: 245€ (VAT and shipping included in peninsular Spain)

Language: Spanish

Discount for bookstores: consult

Availability: immediate. 24 hours of placing the order 

Orders: Call 91 126 37 66 or request it by email (Esta dirección de correo electrónico está siendo protegida contra los robots de spam. Necesita tener JavaScript habilitado para poder verlo. )

On line shop, Click here


RENOVETEC has published the book "Construction and commissioning of CSP plants ", which details step by step throughout the process of installation of a solar thermal parabolic concentrators, from conception to the completion of the process underway. Throughout its 15 chapters and nearly 500 pages published in color, RENOVETEC dumps his experience in projects in which participated, in different stages and with different responsibilities. The book includes hundreds of photos and graphics that help to understand each of the phases and processes described.

The book includes a comprehensive and detailed chapter which describes the entire process of implementation underway of each one of the systems that make up the plant, in its different phases, to conclude with the set of acceptance tests.

With this book, RENOVETEC concludes the collection dedicated to solar thermal CCP Central, and which consists of the following 12 titles:

  • ·CSP Engineering : the state of the art in solar thermal power plants
  • ·CSP plants: principles of operation, major equipment and systems
  • ·Solar field in CSP plants
  • ·HTF system in CSP plants
  • ·Water-steam cycle in CSP plants
  • ·CSP plants operation
  • ·CSP plants maintenance (2 volumes)
  • ·Occupational risk prevention in CSP plants (2 volumes)
  • ·Construction and commissioning of CSP plants (2 volumes  

INDEX

VOLUME 1

0. CSP PLANTS

  • Csp plants
  • Heat transfer fluid
  • Solar field
  • Steam generation train
  • Steam turbine
  • Steam condensation
  • Generator
  • High voltage system

1. CONSTRUCTION POSSIBILITIES

  • EPC contract
  • Large packages
  • Multi contract
  • Open book modality
  • Conclusions, what is the best option?

2. CONSTRUCTION COSTS

  • Engineering costs 
  • Management of permissions costs
  • Land costs
  • Cost of the line for evacuation of power
  • Water catchment cost
  • Disposal facilities cost
  • Earthmoving cost
  • Overview of the common costs to any project  
  • Overview of specific items to consider
  • General considerations about costs
  • Comparison of costs between renewable technologies
  • CSP projects in other countries 
  • The detailed cost of the solar field
  • Civil work of the power block 
  • HTF system costs
  • Steam generation train costs
  • Water-steam cycle cost
  • Turbogenerator costs
  • Auxiliary systems costs
  • Control system costs
  • Mechanical mounting cost
  • Commissioning costs

3. ORGANIZATION AND SUPERVISION STAFF

  • The importance of the supervision
  • EPC contract supervision
  • supervision staff of the property
  • Construction management
  • Contractor main staff

4. POINTS TO VERIFY BEFORE CONSTRUCTION

  • The geotechnical and topographical study
  • Conceptual engineering completion 
  • Basic engineering completion 
  • Obtaining of the licenses of works
  • Completion of a part of the engineering of detail
  • Analysis of the climatology of the area
  • Logistic study of building materials 
  • Analysis of the packages of the construction
  • Construction planning analysis
  • Selection and training of monitoring equipment
  • Launch meeting

5. CONSTRUCTION PLANNING

  • Reasons to look for a short time
  • General view of the planning of the construction
  • The critical path on a construction site
  • Land movement
  • Modules assembly
  • Solar field construction
  • Power block construction
  • Electric line construction
  • Water supply construction
  • Raft of spill construction 
  • Perimeter works
  • Compensation works
  • The evolution of the construction

6. THE TEMPORARY OFFICES OF WORK

  • Location
  • Extension
  • Offices construction
  • Other services necessary in the office
  • Workshops 
  • Stores

7. SOLAR FIELD CONSTRUCTION

  • Civil works
  • Modules construction
  • Solar field modules mounting
  • Valves mounting
  • Crossover mounting or closure of loop
  • Piping assembly
  • Electrical assembly
  • Instrumentation mounting 
  • Checks to be carried out in the solar field

VOLUME 2

8. THE CIVIL WORK OF POWER BLOCK 

MARKING 

DECISION ON THE FINAL DIMENSION 

REMOVAL OF THE LAYER OF EARTH PLANT 

SELECTED MATERIAL CONTRIBUTION 

BARRAGE 

LAYOUT 

THE UNDERGROUND SYSTEMS 

VIALS

FOUNDATIONS 

CONCRETE STRENGTH TESTING

BUILDINGS 

TESTS OF WATERPROOFING OF BUILDINGS

RAFTS

9. STEAM TRAIN GENERATION ASSEMBLY

EQUIPMENTS THAT ARE PART OF THE STEAM GENERATION TRAIN 

STEAM GENERATION TRAIN CONFIGURATION

FOUNDATION 

PREVIOUS VERIFICATIONS TO BE CARRIED OUT 

HEAT EXCHANGERS ASSEMBLY

SAFETY VALVES INSTALLATION 

INSULATED 

INSTRUMENTATION ASSEMBLY 

DOCUMENTS GENERATED IN THE ASSEMBLY 

CHECKS TO BE CARRIED OUT DURING ASSEMBLY

CHECKS TO BE CARRIED OUT AFTER ASSEMBLY

ASSEMBLY TIME

10. PUMPS ASSEMBLY

PUMPS IN A SOLAR THERMAL POWER PLANT

HORIZONTAL MOTOR PUMP ASSEMBLY

VERTICAL MOTOR PUMP ASSEMBLY

CHECKS TO BE CARRIED OUT DURING THE ASSEMBLY

CHECKS TO BE CARRIED OUT AFTER THE ASSEMBLY

CHECKS TO BE CARRIED OUT BEFORE THE ASSEMBLY

11. PIPING ASSEMBLY

PIPING ASSEMBLY

TYPES 

MATERIALS

ACCESSORIES

PIPE JOINTS

PIPING PREASSEMBLY

DILATIONS

THE UNION OF PIPE WITH ROTATING EQUIPMENT

PIPE LAGGING 

12. DEPOSITS ASSEMBLY

TANKS REQUIRED IN A CSP PLANT

THE PROCESS OF CONSTRUCTION OF A TANK

OTHER ELEMENTS OF THE TANK

THE INSTRUMENTATION OF THE TANKS 

CHECKS TO BE CARRIED OUT BEFORE THE START 

CHECKS TO BE CARRIED OUT DURING ASSEMBLY

CHECKS TO BE CARRIED OUT AFTER ASSEMBLY 

13. TURBINE AND GENERATOR ASSEMBLY

TURBINES SHIPPING 

PREVIOUS ISSUES CHECKING 

FOUNDATION

CABLES AND PIPES 

PLACEMENT 

LEVELING 

ALIGNMENT 

CLAMPING

EXPANSION AND CONTRACTION 

AUXILIARY SYSTEMS ASSEMBLY

ELECTRICAL AND INSTRUMENTATION INSTALLATION 

GENERATOR ASSEMBLY 

DOCUMENTS GENERATED IN THE ASSEMBLY OF THE TURBINE AND GENERATOR 

CHECKS TO BE CARRIED OUT DURING ASSEMBLY

CHECKS TO BE CARRIED OUT AFTER ASSEMBLY 

ASSEMBLY TIME

14. SUBSTATION ASSEMBLY

SUBSTATION MECHANICAL ASSEMBLY 

CENTRAL SUBSTATION MAIN EQUIPMENTS 

SUBSTATION TYPES

OUTDOOR SUBSTATION MECHANICAL ASSEMBLY  

CONNECTION SUBSTATION MODIFICATION 

CHECKS TO BE CARRIED OUT AT THE BEGINNING OF THE ASSEMBLY

CHECKS TO BE CARRIED OUT DURING THE EXECUTION 

CHECKS TO BE CARRIED OUT AFTER INSTALLATION

15. COMISSIONING  

WHAT IS COMMISSIONING?

PROCESS DURATION 

PERMISSIONS REQUIRED

GENERAL STAGES OF THE COMMISSIONING OF AN INSTALLATION

COMMISSIONING EQUIPMENT

SYSTEMS THAT MUST BE IMPLEMENTED

PREVIOUS CHECKS 

PRE-DELIVERY TESTS

THE COLD COMMISSIONING OF EACH SYSTEM

FIRE PROTECTION SYSTEM COMMISSIONING

SUPPLIES COMMISSIONING

HTF SYSTEM COMMISSIONING

SOLAR FIELD COMMISSIONING

STEAM GENERATION TRAIN COMMISSIONING

WATER-STEAM CYCLE COMMISSIONING

STEAM TURBINE COMMISSIONING

THE RISE OF LOAD 

OPTIMIZATION AND ADJUSTMENT OF PARAMETERS 

PERFORMANCE TESTS 

SECURITY DURING THE COMMISSIONING PROCESS

COMMISSIONING BUDGET

 

 